[[{“value”:”Hello!
I am a master scheduler at a company that utilizes an ISeries ERP system called ERP-LX. I am currently diving deep into optimizing our usage of the system for primarily operations (capacity planning, control number scheduling, production sequencing, just-in-time manufacturing, etc.). Was wondering if any of you had a direction to point me for receiving training for strategic operational usage of a system like this.
Thank you!
submitted by /u/SmEliot43[link][comments]”}]] Read More